Once I put in the knee-wall doors (to access the storage space), we are ready for the final inspection.

We're waiting on the inspection to put up the baseboard trim and fix the last 2 or 3 spots of drywall that still need work, just in case something else comes up. Once that's all done, we'll actually be taking a break until Fall. I'd like to get another raised bed into the backyard, and we have some minor painting and stuff on the first floor to take care of.

Also, we're not painting or moving anything up there right away since we still need somewhere to put the extra flooring, etc for the other half of the attic - there's no point in painting if we're just going to end up scuffing the walls later. If the floor gets damaged, though, there will be blood.